Shropshire Farms’ anaerobic digestion plant is a private energy project fuelled by vegetable waste and locally grown maize and generates around 2.4 MW of green energy. The project provides energy to power a local mushroom farm and funnels any spare capacity back into the national grid, generating an additional income stream.
We were commissioned to undertake a full route proving exercise to the site from the existing electricity network. The district network operator had proposed a complex and expensive route from the point of connection to the site, which comprised railway and river crossings. Importantly, these crossings would also mean long lead times with the current operators to gain consent. We delivered the scheme and successfully challenged the connection point, resulting in a reduced circuit length in conjunction with a significant cost saving.